Expand the Bearing Engineering Cluster in your Megacity with its second production building! This massive industrial facility represents another key part of a modern bearing manufacturing complex, providing additional space for production lines, machining, assembly, and technical operations. The large enclosed workshop, tall industrial gates, extensive rooftop engineering equipment, ventilation systems, and prominent exhaust structure give the building a convincing heavy-industry character. Its yellow, white, and dark gray design visually connects it with the first building, allowing both models to form a recognizable unified industrial complex. Place the buildings side by side or combine them with warehouses, logistics facilities, rail infrastructure, and other factories to create a large engineering district. An excellent model for making your Megacity not only bigger, but economically and industrially more believable.
← All Buildings
CITY-BUILDER MODEL
BEARING ENGINEERING CLUSTER — BUILDING 2
CB10-IND-027
Category:
Industry
Subcategory:
Industrial Plants
Map Grid2×2
Floors3
DifficultyVery Easy
Scale1:600
Get / Download Model
This model is included in the following City-Builder magazine sets.
Model Specifications
About This Model
Available in Magazines
Available in Magazines
This model is included in the following City-Builder magazine sets.
Download on Etsy
Download on Patreon